As the project life cycle gets underway, there are inevitably going to be a number of instances in which something may be done in a way which is either incorrect or merely ends up being in congruent with the way in which things need to be done, possibly doe to some sort of a change that was implemented at the administrative and or organizational level. In such instances as this, it is often the case that the project management team and or the project management team leader may need to make some number of changes to the way that things are being run. In this case the project management team and or the project management team leader may submit this change request via a formal written document that is referred to as the requested change. In these instances, the requested change will then be forwarded through the project change review process, typically referred to within the project area as the project’s integrated change control process.
Integration Management
Requested Change
1 min read
Updated Jul 27, 2017
Project Victor archive
Keep reading
Related answers from the library.
Top 10 Work Authorization Systems: Industry-Specific Solutions for Enhanced Productivity
Work authorization systems are essential tools in project management, ensuring that tasks are executed by the appropriate personnel, at the right time,…
Work Authorization System
A Work Authorization System (WAS) is a structured way to ensure that work on a project is started only when it has…
Work Authorization (Method)
It is important for those in charge of project management that they are aware of how they convey the work authorization to…
Variation
Understanding Variation in Project Management: A Key Factor in Managing Uncertainty In project management, variation refers to the deviation between actual conditions…